Lotus Club Queensland
Dedicated to the promotion and enhancement of the Lotus experience
Login
Register
  • Home
  • About Us
  • Membership
    • Member Login
  • Events
    • Calendar
  • Motorsport
    • Lakeside DTC Timed Laps
    • LAKESIDE DTC RESULTS
  • Magazine
  • For Sale
    • Merchandise
    • Classifieds
  • Posts
  • Galleries
  • Directory
    • Suppliers & Parts
    • Advertisers
  • Archives
mounts-2

More Duratec Madness

By Joe Arico

PART 1 – December 2016

As most of you will have read in the club magazines, Mike Moore and I have been busy putting Duratecs into our Elises. You may know Mike’s install well from all the great articles he’s written. While our builds use common components, they do differ quite a bit. The most essential ingredient though is the same – they are both built by a couple of car nuts in a shed.

After 18 months of work the car has been a runner now for about 4 months. The first couple of months were painful, sorting out teething issues with the tune. Fortunately, I did get it ready for the final round of the QLD Super Sprints in September (literally the night before!). It was a baptism of fire for the car but I’m glad to report that it survived a 400km round trip to the track and competed all weekend without issue. I even came away with a trophy.

So, let’s rewind back to the beginning. One of the biggest goals when I set out to do the conversion was to be able to retain the air conditioning. In the 8+ years I’ve owned the Elise I’ve put a lot of time into getting the AC to work effectively. I wasn’t going to let all that work go to waist! Besides, if you realistically want to use the car in summer in QLD you really don’t have a choice.

It very quickly became apparent that keeping the AC wasn’t going to be easy though. It was clear I was going to have to think outside the box and do something a bit different. The only way I could fit everything in was to move the alternator to the back of the engine and run it on a shaft. The AC compressor was easy – a standard Mazda 6 compressor bolts straight up to the engine block. I wasn’t making life easy for myself but I was determined not to give up on the idea and give it a go! I just had to make sure that everything else I did supported this design goal.

While I worked out what to do with the AC it also became clear (to both Mike and I) that the partial “kit” purchased out of the UK was not engineered to the level required. Most of the components supplied were good quality but the mounts put the engine in a position that was most definitely going to be problematic. To get acceptable clearance around the front of the engine they needed to be redesigned. This is where the project suddenly got a lot more complicated!

It’s worth saying at this point that when I set out to design all these parts I had none of the CAD skills required. I have a long engineering background but I had never used a 3D design package before. However, I had always wanted to learn. I was fortunate to have access to such a package through my work. It was a steep learning curve but after some head banging I eventually got the hang of it. It really is amazing what you can do with the technology available today!

I was also fortunate to have a good friend at work with a 3D printer so I prototyped many of the parts in plastic before committing to manufacturing in aluminum. After a bit of careful measuring I ended up redesigning the mounts to lower the engine 13mm in the car. This may not sound like a lot but it made a massive difference.

Anyway that’s where I’ll sign off for this issue. I’ll leave you with some pictures of early prototype plastic mounts. Happy and safe Xmas to all!


L-R: Front mount, alternator relocation, gearbox mount.


PART 2 – June 2017

Firstly, apologies for the long delay between Parts 1 and 2. Have 6 months really passed? I can’t believe it.

I signed off last time having shown the plastic prototype brackets I printed to trial fit all the components. The next stage was to find a reputable machine shop to make my prototypes become a reality.

It’s very difficult to find someone that will take on this “one off” low volume kind of work. RAGE (Race & General Engineering) on the Gold Coast were happy and keen to help. I have to say that on an overall scale from 1 to 10 of all the suppliers I dealt with on the project (with 10 being the highest of course) RAGE score a 10 in my book. They did excellent work, communicated well and for the majority of my parts provided a very fast turnaround. I simply supplied the design files and a 2D dimensional drawing and on average, a week later the parts would show up.

Unpacking the first package revealed something much “prettier” than I was expecting! Pictured below (right) is the front engine mount and gearbox mount prior to anodizing. A few weeks later after a bit of careful design the final engine mount showed up (shown at left).

L-R: Final engine mount, front engine mount & gearbox mount prior to anodizing.

It’s worth mentioning at this point that a lot of effort went into ensuring the mounts did not preload (i.e. twist) the rubber isolators. This ensures you get the best vibration isolation possible and on that front, I can report that the car doesn’t feel any different to the original K series with the harder mounts I was running.

Remaining true to my original intentions I will continue to try and tell the story with pictures. The following shots show the final parts installed.

In Part 3 I will go into more details on the air conditioning parts – by far the most challenging section of the project.

That’s all for now. Thanks for reading!

The Story of a Coincidence Morgan Park B Series Rd 1 – May 2017

Related Posts

duratec-banner

Articles, Homepage, Technical

Duratec Elise – better late than never

plus2-banner

Articles, Gallery 2022, Homepage, Technical

Unique +2 Road Trip to Brisbane

helmet-banner

Articles, Homepage, Racing

$10 HEAD/$10 HELMET

Random images

IMG_4860 IMG_4898 9-Wine-and-cheese MG_5981 pair-of-sunbeamers history-in-a-line btiu-05 01 P1020849 003 Pits IMG_4833 IMG_4444 IMG_4424 IMG_4402 IMG_6884 IMG_6876 lot_021 IMG_6556 119_1953_IMG 20161105_111852 IMG_6078 Gideon-and-Paul Evans-Motorsport-Exige IMG_0472-1 DTC-025 Mt-Cotton-Hillclimb-Sep17-08 Mt-Cotton-Hillclimb-Sep17-04 20170424_133300_001 IMG-0165 118_1809_IMG Giles returns Jeff Car 151 on track emr-1 Where's that ball going DS7_3450_full concours-8 Russells-Lotus-Carlton-2 Caught!- P1090185 IMG_6332 IMG_8076 IMG_8018 IMG_5142 IMG_7369 Cracking-the-whips Campfire-Dinner-2 Morning-Sunrise IMG_5207 Dick's-Seven Geoff-watching-his-fuel-disappear-into-Clives-car- 2006_08_27_Gympie_Skid_Pan0039 Sep_MS02_2 WA_Police_Forensic_Unit_at_work P1080259 Ploughman's Lunch img_1089 P8310106 IMG_8921 IMG_5206 IMG_5205 IMG_5204 IMG_3664 31_MG_2697 11_Interior_of_Maiala_Rainforest_Teahouse Daryl_fixing_a_rattle PICT7278 The_way_to_Craig_s_heart P1060282 IMG_3167 P1050430 160_160 20090822_083 P1060270 P1060294 Melted-turbo A-Pride-of-Sevens Coffee-at-Rutherglen-1 _MG_9540 as Smart Object-1 fullsizeoutput_6568 IMG_9682 Planning the Course Winston-and-Wil Dick Heading for Mt Alford 3_gw Camp Trevor-Basset-in-his-Ferari-Daytona-Group-4-replica_ Cols-Elan-2 img_2045 Ian-Wright-and-Tony-checking-progress-by-Craig-Wilson IMG_1425 IMG_8193 Steve and Co Table 2 main-33 Transport-Museum-Dolomite-1 main-54 IMAG5961 IMAG6156

Recent Articles

  • Morgan Park Sprints R4
  • Kev’s Big Day Out
  • Duratec Elise – better late than never
  • Gold Rush Hill Sprint – 2022
  • Marburg Pub Run – 4 Sept 2022
  • Unique +2 Road Trip to Brisbane
  • Leyburn 2022
  • August 2022 DTC

Latest Gallery Images

20220220_093834 20220220_093818 20220220_093827 20220220_093743 20220220_093812 20220220_093730

Search articles by category

Archived articles

Lotus Club Queensland
© Lotus Club Queensland   |   Site by Black Eye Studios